- Date
- October 1, 2026Date of the latest message in the file. The file is a compilation; each page carries its own message dates.
- Source
- Town of Indian Trail
- Reference
- Town project 20240083
- Pages
- 43
- What it is
- Email threads between Town planning staff, the developer's engineers (ESP Associates), Tyson Group staff and residents about the townhome site plan (Town project 20240083, “Copper Station”), its review rounds and conditional Planning approval, a construction trailer permit, and the Planning Director's statements to residents about the Crismark CC&Rs.
- Provenance
- Scanned printouts included in the Crismark records collection as the first of three public information request (PIR) responses from the Town of Indian Trail. The request letter and the Town's cover letter are not in the collection.
- Verification
- Content is consistent with Town email formatting and N.C.G.S. Chapter 132 notices. The request, its date and the Town's transmittal have not been obtained.
- Redactions
- Redacted: street and mailing addresses, email addresses, phone numbers. Names are not redacted. The unredacted record is a public record, available from Town of Indian Trail on request under N.C.G.S. Chapter 132. The fingerprint below is of the unredacted original.
- SHA-256 of original
b34170354de71827d6c1f798b12ba3ea0b980249149a5fd96389e12b9490f5b5